Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2448.7
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Nov 21, 2021     32-4 Tailcone Attachment Step 3-7 - (3 hours)       Category: Fuselage
Made the shims as indicated using already primed .032 aluminum. Positioned after clecoing the Upper tailcone skin.
Matchdrilled with #40 the skin to the longerons and the baggage side bottom and triangle holes.Matchdrilled all the tailcone bottom and top skin into the fuselage skins, longerons and F-1006ABCD bulkheads. Matcdrilled the forward line of rivet on the belly into the F-1006B.
MACHINE COUNTERSINKING NOT DONE YET.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.